Banner script error!
Banner script error!
Banner script error!
Banner script error!
Default BannerBanner script error!
Banner script error!

Once we have tiled and jointed the walls and the floor, we can lay the tile joining the floor to the wall. These tiles should fit perfectly into the jointing.

In this strip between the floor and the wall we normally find the tap and wastepipe connections for the bidet and the stopcock for the toilet cistern.

To make the necessary holes we need to use a 28 mm diamond bit for the tap supply and a 50 mm diamond bit for the wastepipe.

Laying the last tiles.
Now we only need to tile the bath itself. We use stoneware tiles, as selected in the design of the bathroom. Here the quality of the finish is vitally important as users are frequently in unprotected contact with these tiles.


[Prev Page] | [Contents] | [Next Page]

Home Search InfoTile.com InfoTile.com Sitemap Copyright 1995-2010 InfoTile Pty. Ltd. Return to the InfoTile.com homepage